Project Timeline

Budget Tracker

Material Costs

$12,345.67

5.2%

Labor

$8,765.90

1.8%

Overheads

$3,120.00

2.1%

Total Budget

$24,231.57

0.5%

Current Budget vs. Actual

70% of budget utilized so far.

Resource Allocation

Total Resources: 150

Used: 102

Available: 48

John Doe (Project Lead)

Role: Lead, Status: Active

Assigned: 3/5

Jane Smith (Architect)

Role: Architect, Status: Active

Assigned: 2/4

Michael Brown (Engineer)

Role: Engineer, Status: Active

Assigned: 5/6

Sarah Lee (Carpenter)

Role: Labor, Status: Active

Assigned: 1/2

Resource Utilization Chart